Signup as a Tutor

As a tutor you can connect with more than a million students and grow your network.

Have a learning requirement ?
Search from 1000+ Categories right away

Find the best tutors and institutes for

ACET Coaching Classes

Please select a Category.

Please select a Locality.

No matching category found.

No matching Locality found.

Outside India?
6.5 Lakh+ Verified Tutors & Institutes 25 Lakh+ Students 1 Lakh+ Reviews

How UrbanPro Works

1 Post 2 Get responses 3 Finalise

Post your learning requirement

Want to learn something? Just enter
details such as subject or category,
locality and preference.

Get customised responses

Based on your requirement you will start
getting customised responses from tutors and
institutes.

Compare & select the best

Once you get responses, you can
compare them and choose the ones that
fit your learning requirement.

Select from 142 ACET Coaching Tutors near you

Post your Requirement

Connect with the best tutors or institutes

Please enter your name.

Please enter valid email

Please enter valid 10 digit Phone Number

Please enter the Pin Code.

Which location would you prefer for ACET Coaching?

Please select at least one option from Class Location.

By signing up, you agree to our Terms of Use and Privacy Policy.

You Already have an UrbanPro Account

Please Login to continue

Please Enter valid Email or Phone Number

Please Enter your Password

Please enter the OTP sent to your registered mobile number.

Please Enter valid Password or OTP

Forgot Password? Resend OTP OTP Sent

Sorry, we were not able to find a user with that username and password.

We have sent you an OTP to your register email address and registered number. Please enter OTP as Password to continue

Trending discussions in ACET Coaching Classes

Standard Costing

By Ca Prashanth Reddy

Define the term Standard Costing and outline the steps involved therein. According to ICMA, London, Standard Costing refers to "the preparation and use of standard costs, their comparison with actual costs and the analysis of variances to their causes and points of incidence." Standard Costing involves... read more

Define the term Standard Costing and outline the steps involved therein.

According to ICMA, London, Standard Costing refers to "the preparation and use of standard costs, their comparison with actual costs and the analysis of variances to their causes and points of incidence." Standard Costing involves the following steps:

  • Setting up of Standards,
  • Ascertainment of Actual Costs,
  • Comparison of Actual and Standard Costs to determine Variances, and
  • Investigation of variances and taking appropriate action thereon wherever necessary. Installation of a Standard Costing System involves the following preliminary  steps:
  • Establishment of Responsibility Centers: The key areas of operation in the enterprise should be identified into responsibility centers with clearly defined roles, eg. Cost Control, Revenue Maximisation etc. Such responsibility centers may be identified either through:
  • Departmentation or
  • Activity Based
  • Classification of Accounts: The various heads of expense accounts should be classified and codified for collection and comparison of actual costs with standard costs. This will also help the process of mechanized/computerized
  • Selection of a suitable type of standard: For operational requirements, a suitable type of standard should be
  • Length of the period of use: The duration, for which the standards are to be used, should be

What are the advantages of standard costing?

Advantages:

  • Measuring Performance: Standards provide a basis for measurement of actual performance. Standard costing will eliminate any variations in profit due to changes in the values of stock holding from period to period and will thus provide a true basis for the measurement of profit.
  • Cost control: Variance Analysis and investigation of reasons thereof, will provide the basis for appropriate control action. Adverse variances can be controlled and their recurrence avoided.
  • Price Fixings: Standard costs will remain stable over a period of time, as opposed To actual cost which may fluctuate violently. Hence, where demand for a product is elastic, standard cost can be used as a basis for fixing the selling.
  • Management by Exception: If the variances are negligible, it means that  the  performance is more or less in accordance with the standards. Significant variances that warrant the attention of the manager are brought to his knowledge. This facilities control by:

    Introduction of Incentives Standard costing facilitates evaluation of  jobs  and  introduction of incentives. Job values can be determined by the use of evaluation and scale of wages fixed according to the responsibility involved in each
  • Quotations and Estimates: Standard costing facilitates the estimation of the cost of new products with greater accuracy. It can also be used for jobbing
  • Inventory Valuation: Standard Costs represent normal cost and are ideal for inventory valuation, when compared to actual
  • Planning and Budgeting: Standard costing greatly  aids  business  planning,  budgeting and managerial decision making. Standard costs being pre-determined costs, are particularly useful in planning and
  • Standardization: Standard costing aids in standardization of products, operations and processes. Since, standards are laid down for each product, its components, materials, operations, processes etc., it improves the overall production efficiency and reduces.
  • Targets for Responsibility Centers:  It provides objectives and targets to be achieved by each level of management and defines the responsibilities of departmental managers. Standard costs are predetermined on the basis of reasonable and achievable level of output. The departmental head, therefore, comes to know what is expected of him and his level of performance in comparison to the targets can be seen from the variance reports. Thus the system serves as an incentive to the departmental head to achieve the targets set by the company.
  • Comparison facility: Standard costing sets a uniform basis for comparison of  all  elements of costs. Since care is taken in setting standards, the standards become unchanging units of comparison. The standard hour may be used as a basic unit to compare dissimilar products or
  • Optimum Resource Utilisation:The maximum use of working capital, plant facilities and current assets is assured because wastage of materials and loss due to idle time are closely controlled.
read less
0 Dislike
View all comments
Exam Coaching/ACET Coaching Exam Coaching/ICWA Coaching
What is the fee for ICWA coaching?

By Swathi

Kousiki C.

Top Answer

It depends on number of subjects studied, class location, level of subject knowledge that students have, etc.
0 Dislike
View all answers

Find ACET Coaching Classes Tutors and Institutes in your city

Find Verified Tutors across 50,000+ localities

Post your Learning requirement and get connected

Find Now

Looking to teach?

Join UrbanPro and connect with more than 25 Lakh students on the platform. Create a strong profile and grow your network.

Signup as a Tutor

UrbanPro.com is India's largest network of most trusted tutors and institutes. Over 25 lakh students rely on UrbanPro.com, to fulfill their learning requirements across 1,000+ categories. Using UrbanPro.com, parents, and students can compare multiple Tutors and Institutes and choose the one that best suits their requirements. More than 6.5 lakh verified Tutors and Institutes are helping millions of students every day and growing their tutoring business on UrbanPro.com.
Whether you are looking for a tutor to learn mathematics, a German language trainer to brush up your German language skills or an institute to upgrade your IT skills, we have got the best selection of Tutors and Training Institutes for you.
Read more